Production frustrations and company growth limitations

When we first spoke to the Production Manager at Granada, he expressed his frustration regarding the low opacity of the yellow topcoat and the slow application speed of the low-pressure spray equipment they were using.

Having to apply two coats of primer and up to three coats of topcoat was significantly time-consuming for their large fabrications and often made it difficult to meet their production schedules. Having a crane in the workshop for several days during the painting process also limited their capacity to take on more work as the company grew.

Analysis

Assessment of all aspects of the coating process

We identified that by changing over to a high-pressure spray system, more viscous and higher-build coatings could be applied, and at a significantly faster rate. The use of a high opacity primer/finish coating was also agreed to be the most time-efficient product to use. In addition, we offered to match the yellow shade used by the European manufacturer of the crane drive units, in order to create a more uniform finish for their customers.

Implementation 

Assisted product trials and system evaluation

Equipment trials were carried out, using a high-build primer/finish coating: Conseal TU manufactured by Jotun Paints. Granada found they could achieve their desired level of protection from one application. 

The excellent opacity of this product, even as a strong yellow with lead chromate-free pigments, applied directly to the steel, enabling the true shade requested to be consistently achieved with minimal labour costs.

The material costs were also calculated to be lower, in comparison to the multi-coat system Granada had been using.

Ongoing Client Benefits

Assisted an increase in productivity

From follow-up visits to Granada, we learnt that the new process had dramatically increased their productivity. Jobs that would have previously taken four days to complete had been finished in one morning! 

Their confidence in the benefits of the system led them to purchase a second high-pressure spray pump to further increase their output on larger projects. This has enabled them to take on a higher volume of work in recent months than previously would have been practical.

Stay in the loop

Receive Regular Newsletters Straight To Your Inbox
Be the first to receive all the latest articles, tips, tricks, quizzes, calculators, industry advice & news that will land straight into your email inbox!

Case Study: Marpatt

Delivering industry-leading finish & shorter lead times.Our initial conversations with Marpatt centred on their strategic decision to offer a high gloss finish to their clients to complement their other contemporary…

Case Study: deVOL Kitchens

Previously facing issues of batch-to-batch colour consistency causing too many production disruptions.deVOL has been a renowned design-led furniture manufacturer for almost 30 years. From dealing with issues of inconsistency, they…

Case Study: Tom Howley

An initial desire to reduce VOC emissions resulted in a successful reduction, whilst developing a more user-friendly process.Tom Howley has established an exceptional reputation for creating exquisite kitchen designs that…

Case Study: Symphony Group

Issues with the switch to water-based products with poor standards and batch-to-batch consistency.In an attempt to move away from solvent-based coatings, Symphony Group found a water-based coatings supplier yet faced…

Case Study: Charles Yorke

From dealing with adhesion & durability struggles to zero issues for 365 days and counting...Charles Yorke specialises in producing bespoke handcrafted kitchen, bedroom & bathroom furniture. Before working with Kortec,…

Case Study: Fine Rooms & Interiors

"By working with Kortec, we were able to move away from our traditional solvent-based paint, whilst maintaining our finish quality"AnalysisAssessing all aspects of the coatings processFine Rooms had historically used…

Case Study: Bespoke Building & Joinery

Finding a fire-rated lacquer system suitable for the specification and tight production.AnalysisInvestigating the specification required…From the analysis stage conducted by Kortec it became apparent that our client Bespoke Building &…

Case Study: Harvey George

“We managed to seal and prime 8 hours’ worth of spraying in just 45 minutes!”AnalysisA thorough efficiency assessment of the current process When we first met Harvey George, they were using 2-pack…
Book A FREE Discover Session

Take The Next Step Towards Improving Your Coating Processes

Discover the potential to optimise your finishing for maximum efficiency.
Increase Your Productivity Icon

Increase Your

Productivity

Improve Your Profitability Icon

Improve Your

Profitability

Enhance Your Performance Icon

Enhance Your

Performance

Kortec - Efficient Coating Systems - Logo
When it comes to coating systems, you can't afford to take chances.  Kortec's approach is tested and proven to work.
Zenith Point, Belmore Way
Westside Park, Derby DE21 7AZ.
Phone: 0333 123 8747
Email: info@kortec.co.uk
Customer Feedback